DEWA Approval Service

Streamlined Electricity and Water Connection Approvals

View All Services

Overview

DEWA (Dubai Electricity and Water Authority) approval is essential for connecting your property to Dubai's electricity and water networks. We provide comprehensive support in obtaining DEWA approvals, ensuring your project meets all technical, safety, and environmental standards for utility connections.

Why DEWA Approval Matters

DEWA approval is mandatory for all properties requiring utility connections in Dubai.

  • Ensures safe and compliant electrical and water installations
  • Required before property occupancy and handover
  • Prevents utility connection delays and project setbacks
  • Demonstrates adherence to sustainability and efficiency standards
  • Protects against electrical hazards and water system failures
  • Facilitates smooth property registration and transfer

DEWA Approval Process

1

Application Preparation

Submit completed DEWA application form with property details, ownership documents, and technical specifications for electrical and water requirements.

2

Documentation Submission

Provide title deed copy, passport copy, detailed architectural plans showing electrical and plumbing layouts, and project load calculations.

3

Technical Review

DEWA engineers evaluate your submission for compliance with electrical safety standards, load capacity, and water supply specifications.

4

Site Inspection

DEWA conducts on-site inspections to verify proper installation of electrical panels, metering equipment, and water connection points.

5

Approval & Connection

Upon successful inspection, DEWA issues approval certificate and schedules utility connection activation.

Required Documentation

  • Completed DEWA application form
  • Property title deed copy
  • Owner or authorized representative passport copy
  • Detailed architectural plans with electrical layouts
  • Plumbing and water supply system drawings
  • Electrical load calculation reports
  • MEP contractor license and approvals
  • Building permit from Dubai Municipality
  • Swimming pool, landscaping, or auxiliary facility permits (if applicable)

Benefits of Professional DEWA Support

Expert handling of complex application requirements

Reduced processing time through accurate submissions

Guidance on load calculations and technical specifications

Coordination between contractors and DEWA authorities

Prevention of costly resubmissions due to errors

Real-time tracking of application status

Comprehensive compliance verification

Common Challenges We Resolve

Documentation errors and inaccuracies

Misunderstanding of electrical load requirements

Communication delays with DEWA officials

Incomplete technical drawings

Non-compliant equipment specifications

Processing timeline uncertainties

Approval Timeline

Standard DEWA approval: 1-3 weeks depending on project complexity and documentation completeness.

Frequently Asked Questions

Ready to Get Started?

Let our expert consultants guide you through the approval process. Contact us today for a free consultation.

Call +971 589575610