Port, Customs and Free Zone Corporation approvals and EHS certification
Trakhees is the regulatory arm of the Ports, Customs, and Free Zone Corporation (PCFC) governing JAFZA, Dubai Maritime City, certain Nakheel areas, and Dubai World Central. Our comprehensive service covers Trakhees approvals for construction projects, EHS certification (mandatory for all free zone operations), company formation, and regulatory compliance in these strategic port and free zone locations.
Trakhees approval ensures environmental, health, safety compliance and validates operations in Dubai's premier port and free zone areas.
Choose license type: Commercial (trading/import-export), Service (professional/consultancy), or Industrial (manufacturing). Create account on Trakhees Online Registration portal. Access e-services for licensing and approval applications.
Initiate mandatory Environment, Health, and Safety (EHS) certification process. Verify business sector (construction, manufacturing, retail, hospitality, industrial). Prepare EHS compliance documentation and procedures. Submit EHS certification application.
Compile site plan and architectural drawings. Prepare structural drawings by registered engineers. Develop MEP (mechanical, electrical, plumbing) drawings. Create fire safety plans and obtain Civil Defence NOC. Conduct geotechnical report (soil test) per Eurocode, ACI standards.
Engage Trakhees-approved/registered structural engineers. Hire registered architects and consultants. Submit professional registration certificates. Provide structural design calculations per relevant codes.
Upload all documentation through online portal. Submit trade license and proof of ownership/lease. Provide passport/visa copies of directors. Pay applicable fees. Receive application acknowledgment and tracking number.
Schedule site inspection by Trakhees officials. Demonstrate compliance with EHS and technical standards. Address any deficiencies identified. Receive Trakhees approval certificate and EHS certification. Obtain operational clearance.
Navigate mandatory EHS certification requirements efficiently
Ensure compliance with Trakhees-specific technical standards
Access network of registered engineers and consultants
Expedite geotechnical investigations and soil testing
Coordinate multiple approval components (construction, EHS, occupancy)
Reduce approval timeline for villas (1-3 weeks) and large projects (4-6 weeks)
Avoid costly design errors and resubmissions
Ongoing support for license renewals and expansions
Understanding mandatory EHS certification requirements
Meeting Trakhees-specific design and structural standards
Coordinating between multiple consultants (structural, MEP, geotechnical)
Ensuring engineers and architects are Trakhees-registered
Obtaining geotechnical reports meeting international code standards
Navigating different requirements across free zone jurisdictions (JAFZA vs Maritime City)
Managing online portal submissions and documentation formats
Standard villa modifications: 1-3 weeks; Large projects: 4-6 weeks depending on complexity; EHS certification: 2-4 weeks
Let our expert consultants guide you through the approval process. Contact us today for a free consultation.